- SAVE COSTS: The energy cost of a hospital is divided into different areas, the most
important being climate control and lighting.
- CONSUMPTION CONTROL: Control the consumption of the building in real time.
- AVOID LOSSES: Analyze the characteristics of buildings and identify where the most important energy leaks. For walls, windows and roofs loses over 30% of energy.
- INCREASE COMFORT: Make the temperature, humidity and air exchange to give a better sense of comfort to the user and the worker.
SOLUTIONS

-
MONITORING FACILITIES: For to know the distribution of consumption in real time from a hospital and real power used.
-
SURROUNDING IMPROVEMENT: Increase the insulation of facades and roofs, inside or outside. Changing old wooden windows and balconies unsealed.
-
ADJUST TIMES AND CONSUMPTION: Avoid maximum power at certain times.Review contracted power.
-
REPLACE INEFFICIENT FACILITIES: Boilers with great energy demand, gas or electricity.
ACHIEVEMENTS

- PRESTIGE: Company is committed to the environment and energy saving.
-
ECONOMIC SAVING: Reducing expenses by 50%.
-
REVALUATION: Increase the heritage value.
USE CASE: REPORT ON THE CONSUMPTION OF A HOSPITAL
HOSPITAL TYPE WITH 500 SINGLE BEDS: Energy Invoice € 1,775,590 / year.
ENERGY INVOICE | |
INSTALLATION / SERVICE | ENERGY BILL |
Heating | 609.200€ |
Air Conditioning | 270.780€ |
Domestic Hot Water | 138.500€ |
Steam | 186.970€ |
Lighting | 270.780€ |
Office Automation / Data Center | 97.480€ |
Machine room / Engines | 54.150€ |
Operating rooms / Others | 108.310€ |
Kitchen | 539.430€ |
TOTAL | 1.775.600€ |
ACTIONS AND COSTS TO ACHIEVE SAVINGS | ||||
ACTIONS | COSTS €/M2 | ESTIMATED SAVING(%) | ANNUAL SAVING(€) | ROI (YEARS) |
Condensation boilers | 3,4 | 30 | 149.575€ | 2 |
Trigeneration | 32,5 | 30 | 377.777€ | 7-8 |
Heat recovery chillers DHW | 1,2 | 25 | 83.097€ | 1,25 |
Efficient variable speed pumps | 0,7 | 70 | 31.216€ | 2 |
Regulators speed pumps | 0,3 | 40 | 17.838€ | 1,5 |
Free-cooling | 0,5 | 5 | 13.539€ | 3,5 |
Balanced hydraulic heating and cooling networks | 4,45 | 10 | 87.998€ | 4-5 |
VRV scroll compressor | 20 | 30 | 155.967€ | 11 |
Thermostatic Keys | 2,2 | 10 | 42.644€ | 4-5 |
Thermal insulation envelope | 230 | 25 | 220.000€ | 6,5 |
Electronic ballasts | 2,5 | 54.155€ | 4 | |
Presence detectors | 1,34 | 60 | 81.233€ | 1,5 |
Flow regulation (photocells + ballasts) | 4,4 | 40 | 108.311€ | 3,5 |
Balanced hydraulics | 4,6 | 15 | 113.993€ | 3,5 |
High efficiency engines | 0,3 | 20 | 21.662€ | 1 |
Use of Biomass | 9,8 | 35 | 239.945€ | 3,5 |